SAMPLE TERMINATION LETTER TO A UTILITY ENGINEER BY SAFETY DEPARTMENT

A SAMPLE SAFETY TERMINATION LETTER TO A UTILITY ENGINEER ON DAMAGING OF THIRD-PARTY SERVICES (GOVERNMENT WET UTILITY SERVICES)

You company Logo
Company Name
Date: DD/MM/YYYY
Letter References:(Insert here) 
Response Required: YES/NO 

Recipient Company Name 
Address 

Attention: Name and Position 
Project: Project name and details 
Project ID : (Insert Here) 
Contract No : (Insert Here) 
Location : (location of violation) 

Subject: Type of Warning (first, final, termination etc.) this letter is for Immediate termination of Mr. (Name and position of the violator) for damaging of third-party utility services.

This letter to instruct the contractor to remove the above-mentioned employee arises from violating the excavation and underground utility protection procedure by damaging the live foul sewer by mechanical excavation using an excavator. In which causes (specify the hours or days) of the third-party service interruption and work slowdown. 

Maintaining the as asset and utility damage for the work environment is critically important and it is reasonable for a (your organisation or department), and the client to expect that each employee will cooperate and fully abide with project procedure and standard to achieve the set goal in the workplace. 

Wet utility engineer (or relevant position) Mr. (name of violator) assigned a team to perform the excavation without a valid permit and failed to perform an inspection to identify the underground utilities nor he briefed the workers about the precautions while working near and on the live buried utilities. He is found violating their procedure for the preventing and protection of underground utilities. Which led the damage of (specify service damaged e.g. diameter sewer foul water lane) and public services interruption.

After critical analysis and investigation of the above incident by (your organisation or department), it is confirmed that Mr. (name of violator) had directly involved and supervised the team to use the excavator in the close vicinity of live exposed foul sewer line and damaged it. 

(your organisation or department), along with the client project leaders have concluded that the above employee had violated the underground utility protection procedure requirement and there is no reasonable excuse for such an intentional act and this conduct are unsatisfactory. The contractor is accordingly instructed to immediacy remove Mr. (name of violator) from the project for the reason stated above and confirm back to the (your organisation or department), within 3 days for this latter.


Yours faithfully, 

For and on behalf of
Your company name
Your name of project lead name and
Position 

CC: Mentioned the name of person and department to be Carbon Copied to this letter

Note* 
This report will give you a basic idea for further modification and help the safety officer lone handling a site and struggling to draft a detailed letter to the contractor, subcontractor, department, manager or work in charge. The location, the mode of operation and the environment may vary as per the scope of work and the geography of the workplace. 